logo

THS Bio-Energy Cogeneration Plant, Kunak

Sector: Forest Products and Packaging • Location: Malaysia

Source: World Bank Group

Project
Active

In 2002, TSH Bio-Energy began development of a 14 MW biomass-fired power plant at the Kunak palm oil mill at Tawau in Sabah State. The plant would run on waste products from the oil palms. The project was to provide power for the plant, and to sell excess power (up to 10 MW) to Sabah Electricity (the Sabah state utility, 80% owned by Tenaga Nasional Bhd) at 21.25 sen/kWh (US$ 5.592 cents per kWh

Project Information FAQ

Project Information

4 Q
The project “THS Bio-Energy Cogeneration Plant, Kunak” is an infrastructure initiative in the Forest Products and Packaging sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2002, TSH Bio-Energy began development of a 14 MW biomass-fired power plant at the Kunak palm oil mill at Tawau in Sabah State. The plant would run on waste products from the oil palms. The project was to provide power for the plant, and to sell excess power (up to 10 MW) to Sabah Electricity (the Sabah state utility, 80% owned by Tenaga Nasional Bhd) at 21.25 sen/kWh (US$ 5.592 cents per kWh) under a 21-year power purchase agreement signed in October 2002. TSH Bio-Energy was a subsidiary of TSH Resources Bhd, a Malaysian resource-based manufacturer with operations in palm oil milling and plantation, timber flooring manufacturing, cocoa products manufacturing and forest management. Financial closure was obtained in May 2002. The project cost RM 47 million (US$ 12.3 million), and was financed by equity from TSH Resources and loans from the Islamic Private Debt Securities Issuance Programme, Al-Murabaha Commercial Papers/Medium Term Notes arranged by Aseambankers Malaysia Berhad. Construction began in 2003, and the plant entered operations in 2004. In 2002, TSH Bio-Energy was considering building similar bio-mass powered plants at other palm oil mills in Sabah. In 2012, TSH Resources Bhd entered into a new PPA with Sabah Electricity Bhd, supplying power for a period of 9 years at a rate of 30 sen per kWh (US$9.8c/kWh), superseding the previous price of 21.24 sen per kWh (US$6.68/kWh). Combines some info from Sabah Biomass Power (hidden project, id 942) which seems to refer to the same plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data