logo

Tibar Bay Deepwater Port

Sector: Water Supply and Storage • Location: Timor-Leste

Source: World Bank Group

Project
Active

The project entails the construction of a new port at Tibar Bay, west of Dili, Timor-Leste. The sponsor is Bolloré Group which will develop the facility through design, build, co-finance, operate and transfer (DBFOT) basis., EGT Engenharia & FASE Estudos e Projetos (Independent Engineer) was jointly hired to independently supervise the design and construction of the port. The project will require

Status
Prospective
Sector
Water Supply and Storage, Commercial, Government, Seaport
Location
Timor Leste
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tibar Bay Deepwater Port

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tibar Bay Deepwater Port” is an infrastructure initiative in the Water Supply and Storage sector, located in Timor-Leste. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of a new port at Tibar Bay, west of Dili, Timor-Leste. The sponsor is Bolloré Group which will develop the facility through design, build, co-finance, operate and transfer (DBFOT) basis., EGT Engenharia & FASE Estudos e Projetos (Independent Engineer) was jointly hired to independently supervise the design and construction of the port. The project will require an initial investment of $280 million and a further $210 million in expansion costs. The public-private partnership involves an initial investment of US$148.85 million from private partners and US$129.45 million from the government, with Bolloré Port investing another US$211.7 million over the concession period. It comprises the development of a 630 meter wharf with a draught of 15 meters, and a 24 ha yard along the western side of Tibar Bay, along with container storage, equipment and other infrastructure required by a modern cargo terminal. The project reached financial close in August 2018. https://ijglobal.com/articles/136108/tibar-bay-port-timor-lestes-first-ever-ppp http://www.infrapppworld.com/news/megaproject-624-bollore-wins-tibar-bay-port-ppp-project http://www.globalconstructionreview.com/news/bollore-starts-work-st7arts-ti7mor-lest7es-490m/ https://macauhub.com.mo/2017/06/15/pt-porto-de-tibar-comeca-a-ser-construido-em-timor-leste/, https://macauhub.com.mo/feature/chec-starts-work-on-timorese-port/

Original sector

Transport

Procurement method

Budget

Location

Country

Timor Leste

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government, Seaport

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project