Tibar Bay Deepwater Port
Sector: Water Supply and Storage • Location: Timor-Leste
Source: World Bank Group
The project entails the construction of a new port at Tibar Bay, west of Dili, Timor-Leste. The sponsor is Bolloré Group which will develop the facility through design, build, co-finance, operate and transfer (DBFOT) basis., EGT Engenharia & FASE Estudos e Projetos (Independent Engineer) was jointly hired to independently supervise the design and construction of the port. The project will require
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Seaport
- Location
- Timor Leste
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tibar Bay Deepwater Port
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of a new port at Tibar Bay, west of Dili, Timor-Leste. The sponsor is Bolloré Group which will develop the facility through design, build, co-finance, operate and transfer (DBFOT) basis., EGT Engenharia & FASE Estudos e Projetos (Independent Engineer) was jointly hired to independently supervise the design and construction of the port. The project will require an initial investment of $280 million and a further $210 million in expansion costs. The public-private partnership involves an initial investment of US$148.85 million from private partners and US$129.45 million from the government, with Bolloré Port investing another US$211.7 million over the concession period. It comprises the development of a 630 meter wharf with a draught of 15 meters, and a 24 ha yard along the western side of Tibar Bay, along with container storage, equipment and other infrastructure required by a modern cargo terminal. The project reached financial close in August 2018. https://ijglobal.com/articles/136108/tibar-bay-port-timor-lestes-first-ever-ppp http://www.infrapppworld.com/news/megaproject-624-bollore-wins-tibar-bay-port-ppp-project http://www.globalconstructionreview.com/news/bollore-starts-work-st7arts-ti7mor-lest7es-490m/ https://macauhub.com.mo/2017/06/15/pt-porto-de-tibar-comeca-a-ser-construido-em-timor-leste/, https://macauhub.com.mo/feature/chec-starts-work-on-timorese-port/ |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Timor Leste |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Seaport |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
