logo
ProjectActive

TICO

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

The Project consists of the conversion of the Takoradi II (“T2” or “TICO”) plant from its current 2x 110 MW simple cycle configuration to a 330 MW combined cycle plant through the addition of a 110 MW steam turbine (in addition to two heat recovery steam generators and other related equipment). T2 is currently being converted to dual fuel capability, to run both on natural gas and Light Crude Oil

Status
Prospective
Sector
Oil and Gas, Water Supply and Storage, Wind, Hydro, Geothermal, Natural Gas, Government, Power Generation (CCGT)
Location
Ghana
Updated
19 Nov 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about TICO

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TICO” is an infrastructure initiative in the Oil and Gas sector, located in Ghana. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Project consists of the conversion of the Takoradi II (“T2” or “TICO”) plant from its current 2x 110 MW simple cycle configuration to a 330 MW combined cycle plant through the addition of a 110 MW steam turbine (in addition to two heat recovery steam generators and other related equipment). T2 is currently being converted to dual fuel capability, to run both on natural gas and Light Crude Oil (“LCO”) -the plant has a 10-year history of successfully running on LCO only. The conversion of TICO to combined cycle operation will allow the plant to generate an additional 110 MW of power without any incremental fuel consumption. TICO is the developer, owner and operator of the existing T2 plant. The Project is located in Aboadze, Takoradi, in the Western Region of Ghana, on a site adjacent to an existing 330 MW thermal power plant ("Takoradi I" or “T1”) owned and operated by the Volta River Authority (“VRA”).

Original sector

AD - Light Fuel Oil - Thermal Power Generation

Location

Country

Ghana

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Oil and Gas, Water Supply and Storage, Wind, Hydro, Geothermal, Natural Gas, Government, Power Generation (CCGT)

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project