Tide Leveling - Canal Flushing Improvement
Sector: Water Supply and Storage • Location: Marco Island, Florida, United States of America
Source: Dodge USA
The City of Marco Island is soliciting bids to replace existing canal interconnect culverts and stormwater inlet structures under San Marco Rd. and through existing drainage easements between homes. The work includes but is not limited to, removal of existing storm structures and seawall panels, supplying and installing canal interconnect pipes using jack-and-bore and open-cut methods, supplying a
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Residential, Commercial, Car parking, Automotive, Government
- Location
- Marco Island, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tide Leveling - Canal Flushing Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Marco Island is soliciting bids to replace existing canal interconnect culverts and stormwater inlet structures under San Marco Rd. and through existing drainage easements between homes. The work includes but is not limited to, removal of existing storm structures and seawall panels, supplying and installing canal interconnect pipes using jack-and-bore and open-cut methods, supplying and installing seawall panels with openings for the new interconnect pipes, dewatering, turbidity ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Marco Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Residential, Commercial, Car parking, Automotive, Government |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
