logo

Tieling Solid Waste Incineration Power Plant

Sector: Biomass • Location: China

Source: World Bank Group

Project
Active

In April 2017, construction of a solid waste incineration power plant commenced in Tieling City, Liaoning Province. The sponsor of this Build Operate Transfer project was the Hong Kong based CLP Group. The total investment was US$ 92.79 million (RMB 627 million), including an equity of US$ 28.12 million (RMB 190 million). CLP Grouphad a 51% stake in the project with the remaining shares belong to

Status
Prospective
Sector
Biomass, Power Generation (CCGT), Government, Manufacturing (Industrial), Waste Processing and Treatment, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tieling Solid Waste Incineration Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tieling Solid Waste Incineration Power Plant” is an infrastructure initiative in the Biomass sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In April 2017, construction of a solid waste incineration power plant commenced in Tieling City, Liaoning Province. The sponsor of this Build Operate Transfer project was the Hong Kong based CLP Group. The total investment was US$ 92.79 million (RMB 627 million), including an equity of US$ 28.12 million (RMB 190 million). CLP Grouphad a 51% stake in the project with the remaining shares belong to the Tieling Municipal Government. The power plant had a power generation capacity of 24MW. It could process 1200 tons of solid waste per day. Other particulars of the project were not reported.

Original sector

Energy

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Power Generation (CCGT), Government, Manufacturing (Industrial), Waste Processing and Treatment, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project