logo
ProjectStart

TierPoint Data Center Phase 1

One of 10,000+ projects Taiyo tracks in Missouri.

Source: Dodge USA

Proposed build of 22,600 SF of an existing building for data center production and 5 MW of utility power and 3 MW of critical load.

Status
Prospective
Sector
Manufacturing (Industrial), Data Center, Commercial, Power Generation (CCGT), Power Transmission
Location
St. Louis, Missouri, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about TierPoint Data Center Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TierPoint Data Center Phase 1” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in St. Louis, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Proposed build of 22,600 SF of an existing building for data center production and 5 MW of utility power and 3 MW of critical load.

Budget

Location

Country

United States of America (USA)

State

Missouri

City

St. Louis

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Data Center, Commercial, Power Generation (CCGT), Power Transmission

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project