logo

Tierra Mojada CCGT Power Plant

Sector: Wind • Location: Mexico

Source: World Bank Group

Project
Active

The project envisages the construction and operation of a 874 MW combined cycle gas turbine plant located in Zapotlanejo Municipality in the State of Jalisco, Guadalajara. The project will also include the construction of two overhead transmission lines that will connect the project’s substations to two existing transmission lines owned and operated by the Federal Electricity Commission. Ciclo Co

Project Information FAQ

Project Information

4 Q
The project “Tierra Mojada CCGT Power Plant” is an infrastructure initiative in the Wind sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project envisages the construction and operation of a 874 MW combined cycle gas turbine plant located in Zapotlanejo Municipality in the State of Jalisco, Guadalajara. The project will also include the construction of two overhead transmission lines that will connect the project’s substations to two existing transmission lines owned and operated by the Federal Electricity Commission. Ciclo Combinado Tierra Mojada S. de R.L. de CV is the project company which will undertake the project on behalf of the sponsor - Fisterra Energy, part of Blackstone Group. Spanish engineering company Tecnicas Reunidas has been selected as the EPC contractor for the Tierra Mojada project, and Leidos is acting as independent engineer. The output from the power plant will be sold under a 20-year power purchase agreement (PPA) with CFE supplier Comisión Federal de Electricidad Calificados. Financing for the project consist of a term loan and a letter of credit from six banks including: Société Générale, Calyon, Natixis, Sumitomo Mitsui, Mizuho, Intesa São Paulo. Financial closure occurred on 19 June 2017. Project is estimated to cost some $916 million and is being funded by $620 million debt and $296 million sponsor's equity. Commissioning is expected by the end of December 2019. https://ijglobal.com/data/transaction/38087/tierra-mojada-ccgt-power-plant-874mw Factiva

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data