logo
ProjectNotice To Proceed

TILABONI UG

The status, timeline and source of this project. A free account opens every field.

Source: India Investment Grid (IIG)

Information Coal India Limited [CIL] has come up with TILABONI UG with a ticket size of 749.07 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project It is a brownfield project. Tilaboni colliery was an existing underground mine. Coal production started from

Status
Closed
Sector
Road, Government
Location
Paschim Bardhaman, West Bengal, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about TILABONI UG

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TILABONI UG” is an infrastructure initiative in the Road sector, located in Paschim Bardhaman, West Bengal, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

notice to proceed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Coal India Limited [CIL] has come up with TILABONI UG with a ticket size of 749.07 INR Crores. This project in Coal sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project It is a brownfield project. Tilaboni colliery was an existing underground mine. Coal production started from the existing mine since nationalization. As the Tilaboni Block is having multiple seams in the Project Area, It was proposed to augment the production from the mine. PR of Tilaboni UG 1.86 MTY was approved by CIL Board on 12th Feb, 2019 with total capital investment of Rs. 941.85 Crores in Equipment Hiring option. EC available for 2.14 MTY under cluster no. 12 group of mines on 3-03-2016 and its amendment obtained on 31.07.2020. From existing Mines coal production achieved 0.13 MT in 2022-23, 0.113 MT in 2023-24 till Feb-24. As drivage of Incline could not be materialized, it was proposed to operationalize the project through MDO. Accordingly, UCE of PR of Tilaboni UG with MDO option was prepared. UCE approved by CIL Board on 31.01.2023 under MDO option with capital of Rs. 749.07 Crores to be invested by ECL. LOA issued on 30.03.23 to M/s JMS Mining Pvt. Ltd for MDO for Development and Operation of Tilaboni Project. Agreement signed on 2.06.2023.Box cutting for Incline drivage has been started on 26.06.2023.

Original sector

Coal

Procurement method

Budget

Location

Country

India

State

West Bengal

City

Paschim Bardhaman

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project