logo

Tilley Solar Project

Sector: Water Supply and Storage • Location: Newell County 4, Alberta, Canada

Source: Dodge USA

Project
Pre-Design

Construction of a 23.6 Mw solar power project located 4.1 km northeast of Tilley and south of the Tilley A reservoir on Eastern Irrigation District Land. The project was approved by the Alberta Utilities Commission in mid-2022.

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Power Transmission, Solar, Commercial
Location
Newell County 4, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Tilley Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tilley Solar Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Newell County 4, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a 23.6 Mw solar power project located 4.1 km northeast of Tilley and south of the Tilley A reservoir on Eastern Irrigation District Land. The project was approved by the Alberta Utilities Commission in mid-2022.

Budget

Location

Country

Canada

State

Alberta

City

Newell County 4

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Power Transmission, Solar, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project