Tillicum Road Active Transportation Improvements for the Township Of Esquimalt
Sector: Bridge • Location: British Columbia, Canada
Source: Infrastructure Canada
The Township of Esquimalt aims to help construct 500m of protected bike lanes, one new pedestrian crossing, and signal upgrades to accommodate bikes. The project will take place on Tillicum Road between Craigflower Road and the Gorge Bridge, which is an important commuter corridor for the residents of Esquimalt and Saanich, alongside other municipalities in Greater Victoria, British Columbia. The
- Status
- Closed
- Sector
- Bridge, Road, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Tillicum Road Active Transportation Improvements for the Township Of Esquimalt
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Township of Esquimalt aims to help construct 500m of protected bike lanes, one new pedestrian crossing, and signal upgrades to accommodate bikes. The project will take place on Tillicum Road between Craigflower Road and the Gorge Bridge, which is an important commuter corridor for the residents of Esquimalt and Saanich, alongside other municipalities in Greater Victoria, British Columbia. The proposed project will remove one lane of vehicle traffic to accommodate 500m of protected bike lanes. The bike lanes will be at least 1.5m wide with a 0.15m buffer from vehicle lanes and installed within existing curb, which is the constrained minimum. Installing the bike lanes requires Esquimalt to upgrade the Tillicum-Craigflower signal. Community engagements during the planning process strongly highlighted the need for an additional pedestrian crossing signal between Craigflower and the Gorge Bridge. The Township of Esquimalt is considering a new traffic signal to meet the needs identified by our community. Lastly, the Township plans to reduce speed limit from 50km to 40km along Tillicum. The main benefit is to address community identified safety concerns on Tillicum Road by providing protected bike facilities and a new signalized pedestrian crossing. |
Original sector | Active Transportation |
Budget |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Reconstruction of the Île-aux-Tourtes Bridge that connects Montreal and the province of Ontario (Canada)
- Forrest Kerr Hydroelectric Project British Columbia
- Highway Rehab -- Bridge replacement Hallecks Rd., Lyn Rd., United Counties of Leeds and Grenville
- Highway Rehab -- Bridge rehabilitation Stewart Blvd. underpass, North Augusta Rd., underpass, Brockville
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Bridge rehabilitation, Culvert replacement 0.8 km west of Hwy 573 easterly to junction of Hwy 11, Englehart
- Highway Rehab -- Bridge rehabilitation, Resurfacing Hwy 427 to Kipling Ave., Hwy 401 west to Dixon Rd., Toronto
- Highway Rehab -- Bridge replacement Kasabonika Modular Bridge, Kasabonika Remote Northern Airport
- Highway Rehab -- Bridge replacement Grassy Lake Bridge, north of River Valley
