logo
ProjectCompleted

Timan Bauxite Mine

Completed · Russian Federation

Source: International Finance Corporation (IFC)

  • The overall project:The SUAL Group (SUAL, the Group or the company ) is the second largest aluminium producer in Russia, and is considering the expansion of its Timan bauxite mine, as well as the construction and operation of an alumina refinery on the main rail line, 245 km to the southeast, near the town of Ukhta and an aluminium smelter near the town of Pechora about 300 km along the main ra
Status
Closed
Sector
Mass Transit, Metal, Government, Rail, Oil and Gas
Location
Russia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Timan Bauxite Mine

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Timan Bauxite Mine” is an infrastructure initiative in the Mass Transit sector, located in Russian Federation. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

- The overall project:The SUAL Group (SUAL, the Group or the company ) is the second largest aluminium producer in Russia, and is considering the expansion of its Timan bauxite mine, as well as the construction and operation of an alumina refinery on the main rail line, 245 km to the southeast, near the town of Ukhta and an aluminium smelter near the town of Pechora about 300 km along the main rail line from Ukhta. These sites are all located in the Komi Republic in North Urals. The “Integrated Project”, will have a capacity of 6.0-6.5 million tpa (“mtpa”) of bauxite, 1.4 mtpa of alumina and 313 thousand tpa of aluminium. The total cost of the Integrated project is likely to exceed $2 billion, but its development is likely to be phased. During Phase I which is planned for 2003, it is expected that:- the bauxite mine will be expanded from 750,000 tpa to about 2.55 mtpa and associated infrastructure upgraded by SUAL to allow further expansion; - SUAL will try to form a joint venture with a foreign world class aluminium company; and - the bankable feasibility study for the Integrated Project will be carried out. - The Phase I Project – Mine ExpansionPhase I, which comprises the initial bauxite mine expansion, which will at first be used by SUAL’s own alumina refineries and the feasibility study stage of the Integrated project. SUAL has already invested from its own funds on the development of the bauxite mine and on the construction of Russia’s first private railway to connect the mine to the national railway network. The mine development and expansion, according to the preliminary business plan, will require a further $150 million. SUAL is looking to finance this from IFC with a loan of up to $45 million, EBRD with a loan of up to $45 million and the remainder with a B Loan / co-lending / and/or internal cash generation.

Original sector

BG - All Other Metal (Including Tin, Tantalum, Tungsten, etc.)

Location

Country

Russia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Mass Transit, Metal, Government, Rail, Oil and Gas

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project