Timan Bauxite Mine
Sector: Mass Transit • Location: Russian Federation
Source: International Finance Corporation (IFC)
- The overall project:The SUAL Group (SUAL, the Group or the company ) is the second largest aluminium producer in Russia, and is considering the expansion of its Timan bauxite mine, as well as the construction and operation of an alumina refinery on the main rail line, 245 km to the southeast, near the town of Ukhta and an aluminium smelter near the town of Pechora about 300 km along the main ra
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | - The overall project:The SUAL Group (SUAL, the Group or the company ) is the second largest aluminium producer in Russia, and is considering the expansion of its Timan bauxite mine, as well as the construction and operation of an alumina refinery on the main rail line, 245 km to the southeast, near the town of Ukhta and an aluminium smelter near the town of Pechora about 300 km along the main rail line from Ukhta. These sites are all located in the Komi Republic in North Urals. The “Integrated Project”, will have a capacity of 6.0-6.5 million tpa (“mtpa”) of bauxite, 1.4 mtpa of alumina and 313 thousand tpa of aluminium. The total cost of the Integrated project is likely to exceed $2 billion, but its development is likely to be phased. During Phase I which is planned for 2003, it is expected that:- the bauxite mine will be expanded from 750,000 tpa to about 2.55 mtpa and associated infrastructure upgraded by SUAL to allow further expansion; - SUAL will try to form a joint venture with a foreign world class aluminium company; and - the bankable feasibility study for the Integrated Project will be carried out. - The Phase I Project – Mine ExpansionPhase I, which comprises the initial bauxite mine expansion, which will at first be used by SUAL’s own alumina refineries and the feasibility study stage of the Integrated project. SUAL has already invested from its own funds on the development of the bauxite mine and on the construction of Russia’s first private railway to connect the mine to the national railway network. The mine development and expansion, according to the preliminary business plan, will require a further $150 million. SUAL is looking to finance this from IFC with a loan of up to $45 million, EBRD with a loan of up to $45 million and the remainder with a B Loan / co-lending / and/or internal cash generation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
