Timberline Booster Pump Station Replacement
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge USA
Work required under this Contract includes providing all materials, labor, equipment, etc. for the replacement of a water line and booster pump station which includes the installation of two (2) Grundfos Hydro Multi-E CRE 10-10 60Hz booster pumps and replacing approximately 2540 linear feet of existing PVC water line with 6-inch diameter class 305 PVC water line or 6-inch diameter class 350 ductil
- Status
- Prospective
- Sector
- Metal, Water Supply and Storage, Hydro, Government, Steel, Commercial, Waste Processing and Treatment
- Location
- Young Harris, Georgia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Timberline Booster Pump Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Work required under this Contract includes providing all materials, labor, equipment, etc. for the replacement of a water line and booster pump station which includes the installation of two (2) Grundfos Hydro Multi-E CRE 10-10 60Hz booster pumps and replacing approximately 2540 linear feet of existing PVC water line with 6-inch diameter class 305 PVC water line or 6-inch diameter class 350 ductile Iron Pipe. Work on the booster pump station includes excavation and grading of the site, constr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Young Harris |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Hydro, Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
