logo

Timbermill Wind Energy Project

Sector: Road • Location: Tyner, North Carolina, United States

Source: Coastal Review

Project
Operational

Timbermill Wind is a 189-megawatt land-based wind energy project located in rural Chowan County, North Carolina. The project consists of 45 wind turbines, each 345 feet tall with blades creating a 4-acre sweep area. It generates enough clean energy to power the equivalent of 47,000 U.S. homes and has a 30-year lifespan with expected total payments to the county of about $50 million. The project su

Status
Under Construction
Sector
Road, Power Generation (CCGT), Wind, Raw Materials
Location
Tyner, North Carolina, United States of America
Updated
22 Jul 2026
Source
Coastal Review

ConstructChat

Ask ConstructChat about Timbermill Wind Energy Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Timbermill Wind Energy Project” is an infrastructure initiative in the Road sector, located in Tyner, North Carolina, United States. Taiyo aggregates data on it from Coastal Review.

Participants

Not available for this record.

Status

Original status

operational

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Timbermill Wind is a 189-megawatt land-based wind energy project located in rural Chowan County, North Carolina. The project consists of 45 wind turbines, each 345 feet tall with blades creating a 4-acre sweep area. It generates enough clean energy to power the equivalent of 47,000 U.S. homes and has a 30-year lifespan with expected total payments to the county of about $50 million. The project supports local farmers through land lease payments and has improved access roads for farming and hunting.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Tyner

Source

Source

Coastal Review

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Wind, Raw Materials

Article published date

2025-11-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project