Timeline Theatre
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge USA
the project which includes renovation of an historic building as well as new construction will house our future operations. TimeLine s future new home in Uptown is a five-story, 45,500-square-foot warehouse building plus a vacant lot near the corner of Broadway and Argyle. Preliminary plans feature two intimate and flexible black box theatres seating up to 250 and 150 audience members, respectivel
- Status
- Under Construction
- Sector
- Warehouse, Commercial, Residential, Manufacturing (Industrial), Cement
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Timeline Theatre
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the project which includes renovation of an historic building as well as new construction will house our future operations. TimeLine s future new home in Uptown is a five-story, 45,500-square-foot warehouse building plus a vacant lot near the corner of Broadway and Argyle. Preliminary plans feature two intimate and flexible black box theatres seating up to 250 and 150 audience members, respectively. TimeLine s new home also provides an expanded area for the immersive lobby experiences that ar... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Warehouse, Commercial, Residential, Manufacturing (Industrial), Cement |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in United States of America
- Woodridge traffic
- CONSTRUCTION OF NEW 103,406 SQ FT SPECULATIVE WAREHOUSE - INCLUDES LOT MERGER AND DEMO OF ALL (E) STRUCTURES
- NEW 9,870 SQ FT BUILDING FOR WAREHOUSE. "F" OCCUPANCY, TYPE III-B CONSTRUCTION
- ZONING TEXT AMENDMENT TO ALLOW TRUCK TERMINAL IN IP DISTRICT WITH CUP; CUP FOR AMAZON LOGISTICS TRUCK TERMINAL
- SUBDIVISION OF AN (E) WAREHOUSE LEASED SPACE INTO INDIVIDUAL TENANT UNITS USING PRE-FABRICATED PARTITION SYSTEM, SEE TEXT
- CONSTRUCT A 7,844 SQ. FT. ADDITION TO AN EXISTING WAREHOUSE
- TI FOR NON-CONDITIONED SHELL BUILDING 93,515 SQ FT. (3224 OFFICE/90,291 WAREHOUSE)
- SPECULATIVE OFFICE TI BUILDOUT 2,529 SQ FT AND WAREHOUSE LIGHTING (REFER TO SHELL 202105270)
