Timor Solar
Sector: Water Supply and Storage • Location: Timor-Leste
Source: International Finance Corporation (IFC)
The proposed IFC investment is to support an SPV to be set up (the Project Company), jointly owned by EDF power solutions International S.A.S (50.99%), EDF power solutions Developpement S.A.S. (0.01%) and I-Environmental Investments Pacific Pty Ltd. (49%), for the development of greenfield hybrid plant including 90MWp/72MWac solar PV and 80 MWh BESS in Manatuto municipality, Timor-Leste (the Proj
- Status
- Prospective
- Sector
- Water Supply and Storage, Solar, Warehouse, Energy Storage, Power Generation (CCGT), Power Transmission, Government
- Location
- Timor Leste
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Timor Solar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed IFC investment is to support an SPV to be set up (the Project Company), jointly owned by EDF power solutions International S.A.S (50.99%), EDF power solutions Developpement S.A.S. (0.01%) and I-Environmental Investments Pacific Pty Ltd. (49%), for the development of greenfield hybrid plant including 90MWp/72MWac solar PV and 80 MWh BESS in Manatuto municipality, Timor-Leste (the Project). The Project is expected to be supported by IFC as implementing entity of IDA21 Private Sector Window (PSW) Blended Finance Facility (BFF) and IDA21 PSW Risk Mitigation Facility (RMF), and for its own account under IFC’s Concessional Capital Window (CCW) for IDA21 (CCW-IDA21). |
Original sector | V-BF - Solar - Renewable Energy Generation |
Location
Country | Timor Leste |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Solar, Warehouse, Energy Storage, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2026-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Timor-Leste
- Tibar Bay Deepwater Port
- Rural Resilience and Livelihood Improvement Sector Project
- The Project for Agriculture Master Plan and Irrigation Development Plan
- Dili Water Supply Project
- Community Driven Nutrition Improvement
- Timor Leste Water Supply and Sanitation Project
- Second Agriculture Rehabilitation Project
- Building Climate/Disaster Resilience Along The Dili-Ainaro and Linked Road Corridors in Timor-Leste
