Timpanogos SSD Thermal Dryer Bldg
Sector: Water Supply and Storage • Location: American Fork, Utah, United States of America
Source: Dodge
The Project includes the following Work: 1. Construction of new Thermal Dryer Building which includes: a. Hopper Storage Room i. Huber Supplied Hopper that will need to be field welded and tested by Contractor. b. MCC Room / Control Room i. Multiple Story Structure located inside the Cake Hopper Room footprint. c. Thermal Dryer Room i. Installation and Assembly of Huber Supplied equipment includin
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Geothermal, Cement, Commercial
- Location
- American Fork, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Timpanogos SSD Thermal Dryer Bldg
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: 1. Construction of new Thermal Dryer Building which includes: a. Hopper Storage Room i. Huber Supplied Hopper that will need to be field welded and tested by Contractor. b. MCC Room / Control Room i. Multiple Story Structure located inside the Cake Hopper Room footprint. c. Thermal Dryer Room i. Installation and Assembly of Huber Supplied equipment including but not limited to... 1. Two Thermal Dryer Systems 2. Drag Chain Conveyance System ii. Installa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | American Fork |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Geothermal, Cement, Commercial |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
