Tires Plus
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This new construction consists of: Earthwork(Surveyor, Material Testing, Grading, Site Utilities), Paving(Asphalt Paving, Striping), Landscaping(Irrigation), Concrete(Sidewalks, Curb & Gutter, Building Pad, Dumpster Pad), Masonry(CMU Dumpster Enclosure), Steel(Columns, Joist & Deck, Bollards, Dump Gate Angled Embeds), Carpentry(Cabinets & Countertops), EFIS, Waterproofing, Joint Sealants, Roofing(
- Status
- Closed
- Sector
- Automotive, Metal, Water Supply and Storage, Cement, Commercial, Power Transmission, Road, Steel, Car parking, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Davenport, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tires Plus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This new construction consists of: Earthwork(Surveyor, Material Testing, Grading, Site Utilities), Paving(Asphalt Paving, Striping), Landscaping(Irrigation), Concrete(Sidewalks, Curb & Gutter, Building Pad, Dumpster Pad), Masonry(CMU Dumpster Enclosure), Steel(Columns, Joist & Deck, Bollards, Dump Gate Angled Embeds), Carpentry(Cabinets & Countertops), EFIS, Waterproofing, Joint Sealants, Roofing(TPO), Doors(Overhead Doors by Clopay), Storefront System, Drywall/FRP(Metal Framing), Nichiha Pan... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Davenport |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Metal, Water Supply and Storage, Cement, Commercial, Power Transmission, Road, Steel, Car parking, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
