logo

Tiris Uranium Mine

Sector: Solar • Location: Zouérat (nearest town), Mauritania

Source: Mining Review Africa

Project
Planned

The Tiris uranium project in Mauritania is a greenfield calcrete uranium mine expected to produce an average of 1.8 million lb of uranium oxide per year over a 25-year mine life. The project includes multiple shallow pits, beneficiation plants at mining areas, and a central leach/precipitation plant. It is fully permitted and located in the Sahara Desert, northeast Mauritania. The project aims for

Project Information FAQ

Project Information

5 Q
The project “Tiris Uranium Mine” is an infrastructure initiative in the Solar sector, located in Zouérat (nearest town), Mauritania. Taiyo aggregates data on it from Mining Review Africa.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Tiris uranium project in Mauritania is a greenfield calcrete uranium mine expected to produce an average of 1.8 million lb of uranium oxide per year over a 25-year mine life. The project includes multiple shallow pits, beneficiation plants at mining areas, and a central leach/precipitation plant. It is fully permitted and located in the Sahara Desert, northeast Mauritania. The project aims for first production in 2027 with a capex of approximately US$230 million. The mining operation will be in-house with low strip ratio and no drilling or blasting required. Water resources and power generation solutions have been studied and planned, including boreholes and a hybrid solar/diesel power system. Engineering partner Wood has been appointed for basic engineering and early works package definition.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data