TISD - Innovation Center Building 4 Renovation
Sector: Raw Materials • Location: Tomball, Texas, United States of America
Source: Dodge
The Owner plans to renovate approximately 5,900 SF of existing office space, in Building #4, that includes expansion of restrooms, adding a lounge/breakroom area and approximately 5,600 SF of existing storage area that is to be reconfigured. The project also includes additional parking and sidewalks added at the front/main entry of the building. Refer to the Architects drawings for further clarifi
- Status
- Closed
- Sector
- Raw Materials, Car parking, Automotive, Education, Government, Manufacturing (Industrial), Commercial, Residential
- Location
- Tomball, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about TISD - Innovation Center Building 4 Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Owner plans to renovate approximately 5,900 SF of existing office space, in Building #4, that includes expansion of restrooms, adding a lounge/breakroom area and approximately 5,600 SF of existing storage area that is to be reconfigured. The project also includes additional parking and sidewalks added at the front/main entry of the building. Refer to the Architects drawings for further clarifications. The project is located within the City of Tomball jurisdiction for permitting The Projec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Tomball |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Car parking, Automotive, Education, Government, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
