TISZA FLOOD PLAIN (FL20150006)
Sector: Water Supply and Storage • Location: Hungary
Source: European Investment Bank (EIB)
The Tisza Flood Plain project affects 62.21 km of embankments on the right bank and 53.25 km on the left bank of the Tisza river and involves a combination of measures of reconstruction of embankments of nature protections, improvements to summer and natural levees as well as river training interventions and improvements of flow within the flood conveyance zone.
- Status
- Prospective
- Sector
- Water Supply and Storage
- Location
- Hungary
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about TISZA FLOOD PLAIN (FL20150006)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Tisza Flood Plain project affects 62.21 km of embankments on the right bank and 53.25 km on the left bank of the Tisza river and involves a combination of measures of reconstruction of embankments of nature protections, improvements to summer and natural levees as well as river training interventions and improvements of flow within the flood conveyance zone. |
Original sector | Water, sewerage |
Budget |
Location
Country | Hungary |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
