Tiwi binary geothermal power plant

Sector: Geothermal • Location: Philippines

Source: World Bank Group

Project
Active

The project entails the the construction of the new Tiwi Binary Geothermal Power Plant in Tiwi, Albay, the Philippines, with a total installed capacity of 17MW. The plant is located on a 1.5-hectare of land where the old Tiwi Geothermal Power Plant is located. The project will be built from the ground up with an entirely new binary plant system, pipes, and transmission line. The plant will be con

Project Information FAQ

Project Information

4 Q
The project “Tiwi binary geothermal power plant” is an infrastructure initiative in the Geothermal sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the the construction of the new Tiwi Binary Geothermal Power Plant in Tiwi, Albay, the Philippines, with a total installed capacity of 17MW. The plant is located on a 1.5-hectare of land where the old Tiwi Geothermal Power Plant is located. The project will be built from the ground up with an entirely new binary plant system, pipes, and transmission line. The plant will be connected to the Luzon Grid via the 69-kilovolt Tiwi-C substation of the National Grid Corp. of the Philippines (NGCP). Sponsor is Aboitiz Power Corporation (AboitizPower), through its subsidiary AP Renewables Inc. In December 2022, AboitizPower signed an EPC contract with Ormat Technologies, Inc. and Desco Inc.. Construction officially started on 17 January 2023 and the binary plant is targeted for completion by the end of 2023. https://aboitizpower.com/news/ap-renewables-inc/aboitizpower-holds-groundbreaking-ceremony-for-new-17mw-binary-geothermal-plant-in-tiwi-albay

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data