TIWRP Polymer System Replacement
Sector: Water Supply and Storage • Location: Los Angeles, California, United States of America
Source: Dodge
The existing polymer blending system at Terminal Island has reached the end of its useful service life. The project will: Remove outdated equipment Implement automation, Integrate DCS for improved maintenance and operation. The project will install Neat polymer transfer pumps Diluted polymer delivery pumps Two 7,000 gal batch mixing tanks Flow control valves VFDs Electrical and control equipment.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Generation (CCGT), Waste Processing and Treatment, Chemical (Industrial), Commercial, Manufacturing (Industrial)
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about TIWRP Polymer System Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing polymer blending system at Terminal Island has reached the end of its useful service life. The project will: Remove outdated equipment Implement automation, Integrate DCS for improved maintenance and operation. The project will install Neat polymer transfer pumps Diluted polymer delivery pumps Two 7,000 gal batch mixing tanks Flow control valves VFDs Electrical and control equipment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Generation (CCGT), Waste Processing and Treatment, Chemical (Industrial), Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
