TIWRP Polymer System Replacement
Sector: Chemical (Industrial) • Location: Los Angeles, California, United States of America
Source: Dodge
The existing polymer blending system at Terminal Island has reached the end of its useful service life. The project will: Remove outdated equipment Implement automation, Integrate DCS for improved maintenance and operation. The project will install Neat polymer transfer pumps Diluted polymer delivery pumps Two 7,000 gal batch mixing tanks Flow control valves VFDs Electrical and control equipment.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | gc bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The existing polymer blending system at Terminal Island has reached the end of its useful service life. The project will: Remove outdated equipment Implement automation, Integrate DCS for improved maintenance and operation. The project will install Neat polymer transfer pumps Diluted polymer delivery pumps Two 7,000 gal batch mixing tanks Flow control valves VFDs Electrical and control equipment. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- William Pond Chemical Toilet Replacement
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- Diet-Induced Changes in Inflammation as Determinants of Colon Cancer (R01)
