TM-Nxera Data Center (64MW)
Source: World Bank Group
"The TM-Nxera Data Center, located in Iskandar Puteri, Johor, Malaysia, is a project, initiated through a joint venture between Singtel's data center unit, Nxera, and Telekom Malaysia (TM). The partnership agreement was announced on June 18, 2024. ST Dynamo DC, currently a wholly-owned subsidiary of Nxera MY, will serve as the joint venture company. According to the terms of the JVA, TM DC Educity
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | "The TM-Nxera Data Center, located in Iskandar Puteri, Johor, Malaysia, is a project, initiated through a joint venture between Singtel's data center unit, Nxera, and Telekom Malaysia (TM). The partnership agreement was announced on June 18, 2024. ST Dynamo DC, currently a wholly-owned subsidiary of Nxera MY, will serve as the joint venture company. According to the terms of the JVA, TM DC Educity will hold a 51% stake in ST Dynamo DC, while Nxera MY will hold the remaining 49%. The project cost is valued at $246.4m (or RM 1.152 billion), with funding provided through equity investments by the sponsors. The start of construction activities was officially marked on July 25th, 2024. Planned with a total capacity of 64 MW, the cloud-enabled Tier 3 data centre campus will use liquid cooling to handle higher power density AI workloads. The facility will be designed, built and certified to Leadership in Energy and Environmental Design (LEED) standards, incorporating energy and water-efficient solutions to optimise the use of resources. To support the new data centre campus, the joint venture plans to expand submarine cable connectivity. The facility is scheduled to begin commercial operations in 2026, with a potential expansion to a capacity of up to 200 MW. " https://themalaysianreserve.com/2024/06/18/tm-partners-with-singtel-for-rm1-152b-data-centre-project-in-johor/#google_vignette ; https://www.datacenterdynamics.com/en/news/singtel-telekom-break-ground-on-64mw-data-center-in-johor-malaysia/#:~:text=Singtel's%20data%20center%20unit%20Nxera,campus%20in%20Iskandar%20Puteri%2C%20Johor.&text=The%20facility%20is%20scheduled%20to%20begin%20commercial%20operations%20in%202026. ; https://www.nxera-dc.com/about-us/newsroom/TM-and-Singtels-Nxera-break-ground-for-sustainable-hyper-connected-data-centre-campus-in-Johor.html#:~:text=Iskandar%20Puteri%2C%2025%20July%202024,campus%20in%20Iskandar%20Puteri%2C%20Johor. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
