logo
ProjectActive

TM1

Active · Colombia

Source: IFC Project Disclosures

IFC is considering an 8-year loan for up to COP$ 735,500mn (approximately US$150mn) for the 260 km-long “Puerto Salgar – Rio Sogamoso” concession between Puerto Salgar and Barrancabermeja in the regions of Cundinamarca, Boyaca and Santander in the northeast of Colombia. The concession is also known as “Troncal del Magdalena 1” or “TM1” (the “Project”), a brownfield toll road awarded in 2022 by Col

Status
Prospective
Sector
Road
Location
Colombia
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about TM1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “TM1” is an infrastructure initiative in the Road sector, located in Colombia. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

IFC is considering an 8-year loan for up to COP$ 735,500mn (approximately US$150mn) for the 260 km-long “Puerto Salgar – Rio Sogamoso” concession between Puerto Salgar and Barrancabermeja in the regions of Cundinamarca, Boyaca and Santander in the northeast of Colombia. The concession is also known as “Troncal del Magdalena 1” or “TM1” (the “Project”), a brownfield toll road awarded in 2022 by Colombia’s National Infrastructure Agency (“ANI”) through a competitive bidding process. The total estimated cost of the project is US$510mn. KMA Construcciones S.A.S, and Ortiz Construcciones y Proyectos S.A., which collectively form the “Autopista Magdalena Medio S.A.S.” or “AMM” group, (the “Company”) with 50% each won the TM1 concession and will be the EPC Contractor as well.TM1 was originally part of the “Ruta del Sol 2” concession awarded in 2010 to another consortium, which was stopped in February 2017 after completing some sections of the double lane highway and left others at different levels of progress. The new concession awarded to AMM, is approx. 45% brownfield and includes three phases: 1) pre-construction activities (i.e. road repairs to the existing road and preparation of the construction phase), 2) construction of a 123 km-long second lane and of eight bypass roads (a ninth bypass has been already built by the former concessionaire) to avoid passing through urban areas over a 47-month period, and 3) operations and maintenance (“O&M”) for 24 years. The project is divided into 13 Functional Units (“UF”). Each UF is a section of the road that can be operated independently. The pre-construction phase will be completed in December 2023. Construction phase will immediately follow.               

Original sector

E-BC - Highway Operations (Includes Toll Roads)

Location

Country

Colombia

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project