ProjectActive

TM2

Active · Colombia

Source: International Finance Corporation (IFC)

IFC is considering an 8-year loan for up to COP$ 661.500mn (approximately US$135mn) for the 272.1 km-long “Sábana de Torres – Curumaní” concession between Barrancabermeja and San Roque in the regions of Santander and Cesar in the northeast of Colombia. The concession is also known as “Troncales del Magdalena 2” or “TM2” (the “project”), a brownfield toll road awarded in 2022 by Colombia’s National

Status
Prospective
Sector
Road, Government
Location
Colombia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about TM2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TM2” is an infrastructure initiative in the Road sector, located in Colombia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IFC is considering an 8-year loan for up to COP$ 661.500mn (approximately US$135mn) for the 272.1 km-long “Sábana de Torres – Curumaní” concession between Barrancabermeja and San Roque in the regions of Santander and Cesar in the northeast of Colombia. The concession is also known as “Troncales del Magdalena 2” or “TM2” (the “project”), a brownfield toll road awarded in 2022 by Colombia’s National Infrastructure Agency (“ANI”) through a competitive bidding process. The total estimated cost of the project is US$564mn. KMA Construcciones S.A.S, and Ortiz Construcciones y Proyectos S.A., which collectively form the “Autopista del Rio Grande S.A.S.” or “ARG” group, with 50% each (the “Company”) won the TM2 concession and will be the EPC Contractor as well.TM2 was originally part of the “Ruta del Sol 2” concession awarded in 2010 to another consortium, which was stopped in February 2017 after completing some sections of the double lane highway and left others at different levels of progress. The new concession awarded to ARG, is approx. 65% brownfield and includes three phases:  a) pre-construction activities (i.e. road repairs to the existing road and preparation of the construction phase), b) construction of a 98.9 km-long second lane and of ten bypass roads as alternative to the town passages (pasos poblados) over a 47-month period, and c) operations and maintenance (“O&M”) for 24 years. The project is divided into 11 Functional Units (“UF”). Each UF is a section of the road that can be operated independently. The pre-construction phase will be completed in December 2023. Construction phase will immediately follow.

Original sector

E-BC - Highway Operations (Includes Toll Roads)

Location

Country

Colombia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project