TM2

Sector: Road • Location: Colombia

Source: International Finance Corporation (IFC)

Project
Active

IFC is considering an 8-year loan for up to COP$ 661.500mn (approximately US$135mn) for the 272.1 km-long “Sábana de Torres – Curumaní” concession between Barrancabermeja and San Roque in the regions of Santander and Cesar in the northeast of Colombia. The concession is also known as “Troncales del Magdalena 2” or “TM2” (the “project”), a brownfield toll road awarded in 2022 by Colombia’s National

Project Information FAQ

Project Information

4 Q
The project “TM2” is an infrastructure initiative in the Road sector, located in Colombia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

IFC is considering an 8-year loan for up to COP$ 661.500mn (approximately US$135mn) for the 272.1 km-long “Sábana de Torres – Curumaní” concession between Barrancabermeja and San Roque in the regions of Santander and Cesar in the northeast of Colombia. The concession is also known as “Troncales del Magdalena 2” or “TM2” (the “project”), a brownfield toll road awarded in 2022 by Colombia’s National Infrastructure Agency (“ANI”) through a competitive bidding process. The total estimated cost of the project is US$564mn. KMA Construcciones S.A.S, and Ortiz Construcciones y Proyectos S.A., which collectively form the “Autopista del Rio Grande S.A.S.” or “ARG” group, with 50% each (the “Company”) won the TM2 concession and will be the EPC Contractor as well.TM2 was originally part of the “Ruta del Sol 2” concession awarded in 2010 to another consortium, which was stopped in February 2017 after completing some sections of the double lane highway and left others at different levels of progress. The new concession awarded to ARG, is approx. 65% brownfield and includes three phases:  a) pre-construction activities (i.e. road repairs to the existing road and preparation of the construction phase), b) construction of a 98.9 km-long second lane and of ten bypass roads as alternative to the town passages (pasos poblados) over a 47-month period, and c) operations and maintenance (“O&M”) for 24 years. The project is divided into 11 Functional Units (“UF”). Each UF is a section of the road that can be operated independently. The pre-construction phase will be completed in December 2023. Construction phase will immediately follow.                                        

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data