logo

təməsew̓txʷ Aquatic and Community Centre / hcma architecture + design

Sector: Steel • Location: Canada

Source: ArchDaily

Project
Closed

Designed by hcma architecture + design, təməsew̓txʷ welcomes all ages and abilities, with a focus on community connections and wellness-based activities, alongside more traditional sporting and fitness pursuits. This all-electric facility is the first completed building to achieve the Canada Green Building Council’s (CAGBC) Zero Carbon Building-Design Standard. It is on-track to receive LEED Gold

Project Information FAQ

Project Information

3 Q
The project “təməsew̓txʷ Aquatic and Community Centre / hcma architecture + design” is an infrastructure initiative in the Steel sector, located in Canada. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Designed by hcma architecture + design, təməsew̓txʷ welcomes all ages and abilities, with a focus on community connections and wellness-based activities, alongside more traditional sporting and fitness pursuits. This all-electric facility is the first completed building to achieve the Canada Green Building Council’s (CAGBC) Zero Carbon Building-Design Standard. It is on-track to receive LEED Gold certification and uses the gravity-fed InBlue filtration system, reducing energy consumption, as well as the usage of chlorine, and the creation of associated harmful byproducts, resulting in improved air and water quality.Inclusive design and physical accessibility are core aspects of the facility’s planning and detailing, evidenced by the generosity of circulation space; high contrast signage that includes braille and tactile directories; fully universal washrooms with adult change tables and lift devices; ramps and zero-entry conditions into the leisure and family hot pools; as well as a transfer ledge in the adult hot pool and moveable floor in the 50m pool. Change rooms offer options for all-genders as well as dedicated male and female spaces. The project will receive its Rick Hansen Foundation Accessibility Gold Certification in the coming weeks.Inside, the east wing houses a multi-use leisure pool under a folded-plate mass timber and steel girder roof with lap lanes, spray elements, and a lazy river, benefitting from indirect natural daylight conducive to athletic performance. The fitness centre also offers varied views of the aquatics and outdoor spaces, enhancing the user experience. Extensive public engagement shaped the facility’s design, ensuring it meets the needs of diverse user groups, including urban Indigenous, Host Nations, multicultural communities, and accessibility committee. A Naming Advisory Panel made up of urban Indigenous and local First Nations gifted the name təməsew̓txʷ to the centre. Meaning “sea otter house” in hən̓q̓əmin̓əm̓, the Down River language of local First Nations, the panel chose it because of the playfulness, joyfulness, and family-oriented nature of the sea otter, reflective of key themes that emerged during community engagement.Canada’s first completed aquatic centre to achieve Zero Carbon Building–Design Standard opens inNew Westminster, BC.təməsew̓txʷ Aquatic and Community Centre has opened in New Westminster, British Columbia. Woven into the landscape with a dramatic unifying roof, the City’s largest capital project to date aims to be the heart and soul of the community and a place for all to connect.Situated on the edge of a residential neighbourhood north of the Fraser River and on Glenbrook Ravine’s former headwaters – a cultural and economic life source for Indigenous peoples for thousands of years – the centre prioritises reconciliation with the natural character of the landscape. The facility blends into the landscape and creates an iconic civic expression, with contrasting arrival experiences through its two plazas. The South Plaza, adjacent to the recreated ravine, is more ceremonial and natural, and the North, located near the gymnasia, more playful and urban. Both plazas connect to a spacious, double-height lobby featuring a heavy timber glulam roof and a sculptural steel spiral stair. A major public sculpture by Squamish Nation artist James Harry called Miyiwts (“Water’s Edge”) welcomes visitors and honors the Host Nations to whom these territories belong.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data