logo

TNB Prai Combined Cycle Power Plant

Sector: Commercial • Location: Penang, Malaysia

Source: World Bank Group

Project
Active

Tenaga Nasional Bhd (TNB) developed a new 1,071 MW combined-cycle gas-fired power plant in Prai, Pulau Pinang on a build-own-operate basis. The electricity generated from the project would be sold to government of Malaysia for a period of 21 years through a power purchase agreement.

TNB formed TNB Prai Sdn. Bhd. (TPSB), a 100% subsidiary of TNB, to implement the power project. TNB is the largest

Status
Prospective
Sector
Commercial, Cable car, Power Generation (CCGT), Power Transmission, Government, Automotive, Natural Gas, Telecommunications
Location
Penang, Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TNB Prai Combined Cycle Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TNB Prai Combined Cycle Power Plant” is an infrastructure initiative in the Commercial sector, located in Penang, Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tenaga Nasional Bhd (TNB) developed a new 1,071 MW combined-cycle gas-fired power plant in Prai, Pulau Pinang on a build-own-operate basis. The electricity generated from the project would be sold to government of Malaysia for a period of 21 years through a power purchase agreement. TNB formed TNB Prai Sdn. Bhd. (TPSB), a 100% subsidiary of TNB, to implement the power project. TNB is the largest electricity utility company in Malaysia with core businesses in the generation, transmission and distribution of electricity. TNB is a publicly listed company in the Malaysian stock exchange. In November 2012, Malaysia's Energy Commission awarded the new Prai power project to TNB in a competitive bidding process where five other qualified international consortiums submitted their proposals to develop a 1,000-1,400MW CCGT in Prai. TNB offered two blocks of the latest proven design single shaft combined cycle plant with state-of-the-art technology with a total capacity of 1,071MW and plant efficiency of approximately 60%. The project achieved financial close on 22 May 2013 by raising Islamic project bond financing (Sukuk) of US$ 512 million for the construction and development of the power plant. HSBC and KAF Investment Bank acted as lead arrangers to the company for the financing. The total cost of the project is estimated at US$ 786 million. The new 1,071 MW Prai power plant is expected to commence operation by March 1, 2016.

Original sector

Energy

Budget

Location

Country

Malaysia

State

Penang

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Cable car, Power Generation (CCGT), Power Transmission, Government, Automotive, Natural Gas, Telecommunications

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project