TN/DOT : Concrete Box Bridge Construction (CO 027)
One of 10,000+ projects Taiyo tracks in Tennessee.
Source: Dodge USA
The grading, drainage, construction of a concrete box bridge, signals, and paving on U.S. 11E (S.R. 34) from U.S. 25E (S.R. 32) (L.M. 11.14) in Morristown to near Morris Boulevard (L.M. 14.94). Project Length - 4.038 miles.Hamblen County
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Bridge, Waste Processing and Treatment, Road, Commercial
- Location
- Morristown, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about TN/DOT : Concrete Box Bridge Construction (CO 027)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The grading, drainage, construction of a concrete box bridge, signals, and paving on U.S. 11E (S.R. 34) from U.S. 25E (S.R. 32) (L.M. 11.14) in Morristown to near Morris Boulevard (L.M. 14.94). Project Length - 4.038 miles.Hamblen County |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Morristown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Bridge, Waste Processing and Treatment, Road, Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
