logo

TN/DOT: Bridge Construction (CO002) REBID

Sector: Water Supply and Storage • Location: Waverly, Tennessee, United States of America

Source: Dodge USA

Project
Bidding

The construction of a welded steel plate girder bridge on Bakerville Road over the Duck River (L.M. 15.71), including grading, drainage, and paving Project Length - 0.468 miles

Status
Prospective
Sector
Water Supply and Storage, Steel, Bridge, Commercial, Waste Processing and Treatment, Road, Metal
Location
Waverly, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about TN/DOT: Bridge Construction (CO002) REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TN/DOT: Bridge Construction (CO002) REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Waverly, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The construction of a welded steel plate girder bridge on Bakerville Road over the Duck River (L.M. 15.71), including grading, drainage, and paving Project Length - 0.468 miles

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Waverly

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Bridge, Commercial, Waste Processing and Treatment, Road, Metal

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project