logo
ProjectComplete

Tnuva - Romania Dairies SRL

Sector: Water Supply and Storage • Location: Romania

Source: European Bank for Reconstruction and Development (EBRD)

The project will develop Tnuva `s green field dairy venture in Romania and consist of (i) a major EU standards dairy plant for the manufacturing of fresh dairy products under Yoplait brand (ii) a milk farm and a livestock feeding centre to ensure high quality milk supply. Transition impact of the project will be derived from the following: TRD-Tnuva Romania Dairies SRL and TRM - Tnuva Romania Milk

Status
Closed
Sector
Water Supply and Storage, Consumer Products, Raw Materials, Biomass, Residential, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Government
Location
Romania
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Tnuva - Romania Dairies SRL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tnuva - Romania Dairies SRL” is an infrastructure initiative in the Water Supply and Storage sector, located in Romania. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will develop Tnuva `s green field dairy venture in Romania and consist of (i) a major EU standards dairy plant for the manufacturing of fresh dairy products under Yoplait brand (ii) a milk farm and a livestock feeding centre to ensure high quality milk supply. Transition impact of the project will be derived from the following: TRD-Tnuva Romania Dairies SRL and TRM - Tnuva Romania Milk SRL –wholly owned subsidiaries of the Israel’s leading food company Tnuva Central Cooperative for the Marketing of Agricultural Produce in Israel Ltd. Up to €15 million equity participation. Up to €55 million. Environmental Review Summary 1. Project Description The proposed investment by the European Bank for Reconstruction and Development (EBRD) involves an equity investment in Tnuva`s green field dairy venture in Romania and consist of (i) the construction of a major EU standard dairy plant for the manufacturing of fresh dairy products under the Yoplait brand and (ii) a milk farm and a livestock feeding centre to ensure high quality milk supply. 2. Environmental classification and rationale The project has been classified B/1 according to the EBRD’s Environmental Policy and Procedures as it involves the expansion of an existing farm and construction of a new dairy facility. These would be typically associated with limited direct environmental, health and safety issues, which can be readily identified and assessed as well as efficiently mitigated with modern technology and project design. For this reason the Bank conducted an environmental analysis of the expansion plans and environmental audit of the existing facilities. These studies took the form of a corporate environmental review. 3. Key environmental issues and mitigation The findings of the review indicate that there are no significant environmental issues associated with the facility or the proposed project. The Company is Israel’s leading food company ‘Tnuva Central Cooperative for the Marketing of Agricultural Produce in Israel Ltd’ and are fully committed to compliance with EU standards and Romanian regulations for environment, health and safety, ensuring that any environmental impacts will be efficiently prevented or mitigated. Site: Dairy - The dairy facility will be located 9km from Bucharest, close to the town of Popsti Leordeni. The closest residential building is 500 metres from the facility. Farm – The farm is located 24.5km south east of Bucharest, near to the village of Adunatii Copaceni. The nearest residential buildings are about 1km away. Regulatory compliance: Dairy – Construction of the dairy commenced in August 2005. The design and construction of the facility will be compliant with EU standards and Romanian standards and regulations. Farm – The existing farm buildings will be renovated and a new milking station will be constructed. All equipment and practices will be compliant with EU standards and Romanian regulations including those on the welfare of animals kept for farming purposes and live animal transport. Air emissions: Dairy – Air emissions from the facility will be confined to those from the boiler, which will comply with national and EU standards. Farm - Air emissions from the farm’s boiler will comply with national and EU standards. Ventilation of the cow sheds will be in strict compliance with national and EU standards and will minimise issues associated with odour. Water Supply: Both sites will be supplied by on-site wells. The quality of the water will be assessed, if necessary pre-treated, and monitored and will meet national and EU regulations on potable drinking water. Waste Water: Dairy – The new dairy facility will incorporate a waster water treatment plant which will conform to EU standards. Farm – Plans for improved waste water treatment at the farm are under development and will be designed to conform to national and EU standards. Solid Waste Management: Dairy – The dairy will carry out waste management in accordance with national and EU standards and will be recycled where facilities exist. Farm - The most significant source of waste will be manure which will be dealt with in accordance with EU and national standards. Health and Safety Management: Health, safety and hygiene issues will managed in accordance with EU and national standards. 4. Environmental opportunities As a new build the dairy will be incorporating modern equipment from the outset leading to efficient operation in terms of the consumption of water and energy. The planned refurbishment of the farm will also incorporate modern technology leading to more efficient and less impacting operation. 5. Disclosure of Information and Consultation In accordance with EBRD policy the Company is required to carry out its actions in accordance with national requirements for public disclosure and consultation. Additionally, the Company will be required to disclose this summary of key environmental issues locally prior to final management review of this project. 6. Monitoring and Reporting Monitoring of the company’s environmental performance during the project will be conducted by the EBRD and will take the form of review of annual environmental reports supplied by the company and ad hoc visits by Bank staff. The Company will also be required to provide the Bank with immediate notification of any material incidents or accidents likely to have an effect on the environment or worker and public safety. None. Ms. Nicole Assif: Email: Nicola@tnuva.co.il

Original sector

Food and Agribusiness

Location

Country

Romania

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Consumer Products, Raw Materials, Biomass, Residential, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project