Toad River Erosion Protection REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work will be conducted at KM 660 on the Alaska Highway and includes construction of an approximately 220 m long riprap revetment along the right downstream bank of the Toad River. The purpose of this revetment is to protect the Alaska Highway from the Toad River during high flow. The project is situated 13 km west of the community of Toad River, BC.
- Status
- Closed
- Sector
- Road, Commercial, Manufacturing (Industrial)
- Location
- Toad River, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Toad River Erosion Protection REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work will be conducted at KM 660 on the Alaska Highway and includes construction of an approximately 220 m long riprap revetment along the right downstream bank of the Toad River. The purpose of this revetment is to protect the Alaska Highway from the Toad River during high flow. The project is situated 13 km west of the community of Toad River, BC. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Toad River |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
