Tobene IPP Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The Tobene expansion project consists of an increase in the installed capacity of the existing Tobene IPP (an HFO fired power plant convertible to gas operations in Senegal) from 96 MW to 115 MW, such that under its Power Purchase Agreement with Senelec it will provide increased a minimum guaranteed capacity, from 70 MW to 105 MW, including 115 MW for the peak demand during the peak season (i.e Ju
- Status
- Prospective
- Sector
- Oil and Gas, Manufacturing (Industrial), Power Generation (CCGT), Geothermal, Government
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Tobene IPP Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Tobene expansion project consists of an increase in the installed capacity of the existing Tobene IPP (an HFO fired power plant convertible to gas operations in Senegal) from 96 MW to 115 MW, such that under its Power Purchase Agreement with Senelec it will provide increased a minimum guaranteed capacity, from 70 MW to 105 MW, including 115 MW for the peak demand during the peak season (i.e June to October). The expansion was awarded to Tobene Power SA on a negotiated basis by the Government of Senegal following the successful completion of the existing Tobene, currently owned and operated by the same company. |
Original sector | V-AC - Heavy Fuel Oil - Thermal Power Generation |
Procurement method | |
Budget |
Location
Country | Senegal |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Manufacturing (Industrial), Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
