The 96MW Tobene IPP reached financial closure in August 2014, when the loan agreement was signed. This BOO project involved the development of a greenfield heavy fuel oil (HFO) thermal power plant and auxiliary installation with an installed capacity of 87.5 MW (5x 15.5 MW MAN combustion engines) and a guaranteed capacity of 70 MW at 91% availability. The project would be located in Taiba Ndiaye,
- Status
- Prospective
- Sector
- Geothermal, Oil and Gas, Power Transmission, Power Generation (CCGT), Commercial, Government
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tobene IPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 96MW Tobene IPP reached financial closure in August 2014, when the loan agreement was signed. This BOO project involved the development of a greenfield heavy fuel oil (HFO) thermal power plant and auxiliary installation with an installed capacity of 87.5 MW (5x 15.5 MW MAN combustion engines) and a guaranteed capacity of 70 MW at 91% availability. The project would be located in Taiba Ndiaye, Senegal and would be connected to the existing Tobene 220/90 kV substation which is located less than 100 meters from the project site. The PPA was arranged with Senegal’s state-owned electric utility, SENELEC, which will be the sole off-taker for 20 years. Construction of the plant was planned to take place for a period of 16 to 18 months. The project company is Tobene Power SA, owned by Malec Power Gen (90%), an affiliated company of the Matelec Group of Lebanon and IFC (10%) which is to retain a 10 percent stake in the project upon completion of a proposed equity investment. Debt-to-equity ratio is 76:24 with an equity investment of US$39.52 million. The financing also included a US$124.69 million (93.4 million euro) 15 year loan arranged by IFC (International Finance Corporation US$38.04 million; Emerging Africa Infrastructure Fund US$33.38 million; FMO US$33.38 million; West African Development Bank US$19.89 million) and a $40 million equivalent IDA partial risk guarantee project agreement. The project will provide power to over one and half million residents in Senegal. http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/651aeb16abd09c1f8525797d006976ba/c2b55884ab72947385257b870060ba1e?OpenDocument |
Original sector | Energy |
Budget |
Location
Country | Senegal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Geothermal, Oil and Gas, Power Transmission, Power Generation (CCGT), Commercial, Government |
Article published date | 2024-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project