Tobene Oil-Fired Power Plant
Sector: Oil and Gas • Location: Senegal
Source: World Bank Group
The project includes the expansion of the existing 96MW Tobene oil-fired power plant, located in Senegal with additional 19MW. Installed capacity will increase to 115MW. Melec PowerGen (Matelec Group) is the owner and operator of the plant. The company financed the majority of the cost of the expansion using other short-term resources, and it is now restructuring the facility’s finances on a long-
- Status
- Prospective
- Sector
- Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Senegal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tobene Oil-Fired Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the expansion of the existing 96MW Tobene oil-fired power plant, located in Senegal with additional 19MW. Installed capacity will increase to 115MW. Melec PowerGen (Matelec Group) is the owner and operator of the plant. The company financed the majority of the cost of the expansion using other short-term resources, and it is now restructuring the facility’s finances on a long-term and sustainable basis. IFC acted as Mandated Lead Arranger and A Lender, Banque Ouest Africaine de Development (BOAD) as Lender and EAIF and FMO, the Dutch Development Agency as B Lenders. The Emerging Africa Infrastructure Fund (EAIF) is increasing its lending to Melec. The new B loan of €6.6 million is part of the financing of the expansion and has a term of 13 years. http://www.pidg.org/news/better-future-for-senegal-with-20ac6-6-million-loan-to-expand-power-station http://eaif.com/news-media/view/emerging-africa-infrastructure-fund-backs-better-future-for-senegal-with-6 http://www.bcafrica.co.uk/sites/default/files/EAIF%2012%206%2017%20Tobene%20Press%20Release.pdf |
Original sector | Energy |
Budget |
Location
Country | Senegal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-06-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
