logo

Tobene Oil-Fired Power Plant

Sector: Oil and Gas • Location: Senegal

Source: World Bank Group

Project
Active

The project includes the expansion of the existing 96MW Tobene oil-fired power plant, located in Senegal with additional 19MW. Installed capacity will increase to 115MW. Melec PowerGen (Matelec Group) is the owner and operator of the plant. The company financed the majority of the cost of the expansion using other short-term resources, and it is now restructuring the facility’s finances on a long-

Project Information FAQ

Project Information

5 Q
The project “Tobene Oil-Fired Power Plant” is an infrastructure initiative in the Oil and Gas sector, located in Senegal. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes the expansion of the existing 96MW Tobene oil-fired power plant, located in Senegal with additional 19MW. Installed capacity will increase to 115MW. Melec PowerGen (Matelec Group) is the owner and operator of the plant. The company financed the majority of the cost of the expansion using other short-term resources, and it is now restructuring the facility’s finances on a long-term and sustainable basis. IFC acted as Mandated Lead Arranger and A Lender, Banque Ouest Africaine de Development (BOAD) as Lender and EAIF and FMO, the Dutch Development Agency as B Lenders. The Emerging Africa Infrastructure Fund (EAIF) is increasing its lending to Melec. The new B loan of €6.6 million is part of the financing of the expansion and has a term of 13 years. http://www.pidg.org/news/better-future-for-senegal-with-20ac6-6-million-loan-to-expand-power-station http://eaif.com/news-media/view/emerging-africa-infrastructure-fund-backs-better-future-for-senegal-with-6 http://www.bcafrica.co.uk/sites/default/files/EAIF%2012%206%2017%20Tobene%20Press%20Release.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data