Tobene
Active · Senegal
Source: IFC Project Disclosures
The Project under consideration by IFC consists of a greenfield heavy fuel oil (HFO) thermal power plant and auxiliary installation with an installed capacity of 87.5 MW (5x 15.5 MW MAN combustion engines) and a guaranteed capacity of 70 MW at 91% availability. The power plant has a footprint of 4.5 hectares and will be connected to the existing Tobene 220/90kV substation which is being upgraded a
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Geothermal, Oil and Gas
- Location
- Senegal
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Tobene
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project under consideration by IFC consists of a greenfield heavy fuel oil (HFO) thermal power plant and auxiliary installation with an installed capacity of 87.5 MW (5x 15.5 MW MAN combustion engines) and a guaranteed capacity of 70 MW at 91% availability. The power plant has a footprint of 4.5 hectares and will be connected to the existing Tobene 220/90kV substation which is being upgraded and is located less than 100m away from the Project site. The Project is located approximately 90km North-West of Dakar, Senegal within the Rural Community of Taiba Ndiaye, in Regional Department of Tivaouane. The HFO will be supplied via trucks by La Sociéte Africaine de Raffinage (SAR) with whom terms of agreement are still under negotiation. The Project is a joint project with the World Bank who is looking to provide a partial risk guarantee.MATELEC is developing the Project as an Independent Power Producer (IPP) incorporated under Tobene Power SA “Tobene Power”, selling power under a 20-year Power Purchase Agreement to the Senegal’s state-owned electric utility, SENELEC, which will be the sole off-taker. Construction of the plant is planned to take place for a period of 16 to 18 months. MATELEC also developed the operating Kounoune power plant in Senegal and the Thika power plant in Kenya, which are both IFC-financed projects. |
Original sector | C-AD - Thermal and Steam Generation |
Location
Country | Senegal |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Geothermal, Oil and Gas |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project