Tobene
Sector: Oil and Gas • Location: Senegal
Source: International Finance Corporation (IFC)
The Project under consideration by IFC consists of a greenfield heavy fuel oil (HFO) thermal power plant and auxiliary installation with an installed capacity of 87.5 MW (5x 15.5 MW MAN combustion engines) and a guaranteed capacity of 70 MW at 91% availability. The power plant has a footprint of 4.5 hectares and will be connected to the existing Tobene 220/90kV substation which is being upgraded a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project under consideration by IFC consists of a greenfield heavy fuel oil (HFO) thermal power plant and auxiliary installation with an installed capacity of 87.5 MW (5x 15.5 MW MAN combustion engines) and a guaranteed capacity of 70 MW at 91% availability. The power plant has a footprint of 4.5 hectares and will be connected to the existing Tobene 220/90kV substation which is being upgraded and is located less than 100m away from the Project site. The Project is located approximately 90km North-West of Dakar, Senegal within the Rural Community of Taiba Ndiaye, in Regional Department of Tivaouane. The HFO will be supplied via trucks by La Sociéte Africaine de Raffinage (SAR) with whom terms of agreement are still under negotiation. The Project is a joint project with the World Bank who is looking to provide a partial risk guarantee.MATELEC is developing the Project as an Independent Power Producer (IPP) incorporated under Tobene Power SA “Tobene Power”, selling power under a 20-year Power Purchase Agreement to the Senegal’s state-owned electric utility, SENELEC, which will be the sole off-taker. Construction of the plant is planned to take place for a period of 16 to 18 months. MATELEC also developed the operating Kounoune power plant in Senegal and the Thika power plant in Kenya, which are both IFC-financed projects. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |