The Project under consideration by IFC consists of a greenfield heavy fuel oil (HFO) thermal power plant and auxiliary installation with an installed capacity of 87.5 MW (5x 15.5 MW MAN combustion engines) and a guaranteed capacity of 70 MW at 91% availability. The power plant has a footprint of 4.5 hectares and will be connected to the existing Tobene 220/90kV substation which is being upgraded a

Project Information FAQ

Project Information

4 Q
The project “Tobene” is an infrastructure initiative in the Oil and Gas sector, located in Senegal. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project under consideration by IFC consists of a greenfield heavy fuel oil (HFO) thermal power plant and auxiliary installation with an installed capacity of 87.5 MW (5x 15.5 MW MAN combustion engines) and a guaranteed capacity of 70 MW at 91% availability. The power plant has a footprint of 4.5 hectares and will be connected to the existing Tobene 220/90kV substation which is being upgraded and is located less than 100m away from the Project site. The Project is located approximately 90km North-West of Dakar, Senegal within the Rural Community of Taiba Ndiaye, in Regional Department of Tivaouane. The HFO will be supplied via trucks by La Sociéte Africaine de Raffinage (SAR) with whom terms of agreement are still under negotiation. The Project is a joint project with the World Bank who is looking to provide a partial risk guarantee.MATELEC is developing the Project as an Independent Power Producer (IPP) incorporated under Tobene Power SA “Tobene Power”, selling power under a 20-year Power Purchase Agreement to the Senegal’s state-owned electric utility, SENELEC, which will be the sole off-taker. Construction of the plant is planned to take place for a period of 16 to 18 months. MATELEC also developed the operating Kounoune power plant in Senegal and the Thika power plant in Kenya, which are both IFC-financed projects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data