logo
ProjectClosed

Tocoma Hydroelectric Power Plant

Sector: Power Generation (CCGT) • Location: Venezuela

Source: Inter-American Development Bank (IADB)

The project is aimed at satisfying the increasing demand of electricity in the country utilizing the hydraulic resources of the Caroní river and substituting the thermo electric generation to decrease the use of non renewable resources.

Status
Closed
Sector
Power Generation (CCGT), Hydro, Government
Location
Venezuela
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Tocoma Hydroelectric Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tocoma Hydroelectric Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Venezuela. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is aimed at satisfying the increasing demand of electricity in the country utilizing the hydraulic resources of the Caroní river and substituting the thermo electric generation to decrease the use of non renewable resources.

Original sector

ENERGY

Budget

Location

Country

Venezuela

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-06-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project