logo

Todd Center Boiler Replacement

Sector: Seaport • Location: Benton Harbor, Michigan, United States

Source: WSJM

Project
Awarded

Lake Michigan College is replacing the boiler at the Todd Center, a 43,400 square foot facility housing Business, Education, and Computer Information Systems programs. The existing boiler has reached its end of life, and the replacement work is scheduled for summer to minimize disruption to students.

Status
Closed
Sector
Seaport, Education, Commercial
Location
Benton Harbor, Michigan, United States of America
Updated
22 Jul 2026
Source
WSJM

ConstructChat

Ask ConstructChat about Todd Center Boiler Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Todd Center Boiler Replacement” is an infrastructure initiative in the Seaport sector, located in Benton Harbor, Michigan, United States. Taiyo aggregates data on it from WSJM.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Lake Michigan College is replacing the boiler at the Todd Center, a 43,400 square foot facility housing Business, Education, and Computer Information Systems programs. The existing boiler has reached its end of life, and the replacement work is scheduled for summer to minimize disruption to students.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Benton Harbor

Source

Source

WSJM

URL

More Details

Record type

Project

Sector

Seaport, Education, Commercial

Article published date

2026-03-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project