Togliatti Trolleybus
Sector: Mass Transit • Location: Russia
Source: European Bank for Reconstruction and Development (EBRD)
Translated version of this PSD: Russian The EBRD is considering providing a loan to the municipal trolleybus company of the City of Togliatti (pop. 740,000) under the full municipal guarantee to finance:
(i) procurement of the new energy efficient low-floor trolleybuses, allowing to replace the existing worn-out fleet and
(ii) upgrade and extension of the trolleybus infrastructure.
The pro
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | cancelled |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Translated version of this PSD: Russian The EBRD is considering providing a loan to the municipal trolleybus company of the City of Togliatti (pop. 740,000) under the full municipal guarantee to finance: (i) procurement of the new energy efficient low-floor trolleybuses, allowing to replace the existing worn-out fleet and (ii) upgrade and extension of the trolleybus infrastructure. The project aims to increase the capacity and standards of public transport services as an alternative to car usage and to provide an overall balanced approach to the urban transport infrastructure development in the City, complementing the previous Togliatti Urban Transport Project. Transition impact will derive from commercialisation and corporate restructuring of the municipal trolleybus company through: (i) Commercialisation: The introduction of a multi-year Public Service Contract with an interlinked revolving Compensation Agreement between Togliatti Trolleybus Company and the City will establish a robust and transparent arms length relationship between parties in terms of (a) service planning, provision, and monitoring; (b) calculation of remuneration for services delivered; (iii) annual indexation of the agreed service cost unit; and (c) routine reporting. (ii) Demonstration of Successful Restructuring: Corporate restructuring of the trolleybus company will result in reduction of operational cost, improved service quality and increased fare revenues The successful implementation of a Corporate Restructuring Plan will be strengthened through establishing related targets, milestones and incentives in the Public Service Contract. This all together will improve both operational and financial performance of the Company. In addition, a comprehensive feasibility study will be carried out on the potential merger of the municipally owned bus trolleybus companies which could provide further synergies and cost savings in service provision. (iii) Improving standards for business conduct: The project will improve the Company’s financial transparency and the quality of financial information through IFRS statements and auditing going forward. The Company will develop and implement an Environmental and Social Action Plan (ESAP) which will significantly improve the company’s environmental management and overall performance. Procurement standards will be improved through application of the Bank’s Procurement Policies and Rules. In addition, by introducing a supervisory committee concept, the PBSA will improve corporate governance. MUP TTU, a municipal trolleybus company, owned by the city of Togliatti. A loan to the company in the amount of up to RUB 355 million (EUR 8.9 million). RUB 420 million (EUR 10.5 million) net of TC funding. Categorised B. The environmental and social due diligence on the original Project was conducted in August 2008 within the remit of the previous Environmental Policy (2003). The due diligence identified a number of environmental, health and safety related issues, including a poor state of repair of the depots and maintenance facilities; obsolete wastewater collection and treatment facilities; inadequate waste storage facilities; poor housekeeping, lack of air emission permits, exceed of personal exposure limits to noise for drivers of old trolleybuses and related occupational illness; lack of any management systems or formal environmental training, etc. Togliatti Trolleybus implements annual health and safety action plans, however due to the budgetary constraints, it covers only the most urgent activities. An Environmental and Social Action Plan was developed by the consultants and submitted to the Client; however there was no progress on the implementation of ESAP due to the delayed approval timetable of the Project and continuous budgetary constraints experienced by the Client. In view of the significant amount of time that has elapsed since the due diligence was conducted and the revision of the Bank's Environmental Policy, the current standing of the environmental, social , health and safety issues vis-à-vis the Bank's Performance Requirement (2008) as well as an implementation status of the ESAP will need to be verified by independent consultants. Pre-signing Post-signing |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
