Togo - CIZO Pilot Project for off-grid rural electrification using solar kits
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The pilot phase is part of CIZO I and has atotal budget estimated at US $2.4 million, the total project costs are estimated to $32.3 million. A SEFA grant of $975,000is requested to fund two activities related to capacity building of the service infrastructure within CIZOI starting in the pilot phase,namely1) establishment of solar academy –$535,000 to train technicians for CIZO and for the rural
- Sector
- Energy Storage, Commercial, Rail, Power Generation (CCGT), Solar, Residential, Government
- Location
- Togo
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Togo - CIZO Pilot Project for off-grid rural electrification using solar kits
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The pilot phase is part of CIZO I and has atotal budget estimated at US $2.4 million, the total project costs are estimated to $32.3 million. A SEFA grant of $975,000is requested to fund two activities related to capacity building of the service infrastructure within CIZOI starting in the pilot phase,namely1) establishment of solar academy –$535,000 to train technicians for CIZO and for the rural electrification agency and 2) training of distribution agents, –$440,000.GoT will fund the other activities ofthe pilot phase with; (i) pilot consumers financing package to facilitate adoption (US $0.3 million) (iii); a pilot incentive package for first DESCOs with a partial financing of 20.000 solar kits (US $1 million), and (iv) various project costs including communication (US $0.1 million). |
Original sector | Energy |
Budget |
Location
Country | Togo |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Rail, Power Generation (CCGT), Solar, Residential, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Togo
- 25 MWp Solar Power Project with 36 MWh Battery Energy Storage in Togo
- Dapaong Solar Power Plant Project
- 25MWp Solar Power Project with 36MWh Battery Storage in Togo
- 25 MWp Solar Power Project with Battery Storage in Dapaong, Togo
- 30kWp Multi-Functional Solar Platform in Yoto Prefecture
- 20 MW-30 MW renewable energy PPP project in Kara or Dapaong
- Café Lumière Solar-Powered Community Electrification Scheme
- 25 MWp Solar Power Project with 36 MWh Battery Storage in Togo
