Togo - Sokodé Solar Power Plant Project
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The project entails the design, financing, construction, operation, and transfer of a greenfield solar power plant in Sokodé, the second largest city in Togo. The project includes an installed solar PV plant of 61.85MWp (42MWac) and an 11km transmission line to be developed under a 25-year Build Own Operate Transfer (BOOT) contract with the Compagnie Energie Electrique du Togo (CEET). The Project
- Sector
- Commercial, Power Generation (CCGT), Geothermal, Solar, Natural Gas, Government
- Location
- Togo
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Togo - Sokodé Solar Power Plant Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the design, financing, construction, operation, and transfer of a greenfield solar power plant in Sokodé, the second largest city in Togo. The project includes an installed solar PV plant of 61.85MWp (42MWac) and an 11km transmission line to be developed under a 25-year Build Own Operate Transfer (BOOT) contract with the Compagnie Energie Electrique du Togo (CEET). The Project will contribute to the government strategy to increase the share of renewable energy in the energy mix which is composed of 80% non-renewable and thermal generation. Financial close (FC) is expected to occur in Q2 2025. The Project will be the second solar PV power plant in Togo after the publicly financed Blitta solar project inaugurated in June 2021 (70MWp): it is thus the first privately financed IPP. |
Original sector | Energy |
Budget |
Location
Country | Togo |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Geothermal, Solar, Natural Gas, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
