Tokyo Cement Biomass Plant
Sector: Water Supply and Storage • Location: Sri Lanka
Source: World Bank Group
Tokyo Cement Company developed the 10MW Biomass plant at Trincomalee City, Trincomalee District, Eastern Province. The project was to be fed by 70% paddy husk, 15% Gliricidia sepium fuel wood, 15% sawdust and 0-1% coconut shells. Total output was expected to be 7.2GWh annually. Tokyo Cement Company was a joint-venture between St. Anthony's Consolidated and Mitsui Mining, incorporated in 1982.
I
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Tokyo Cement Company developed the 10MW Biomass plant at Trincomalee City, Trincomalee District, Eastern Province. The project was to be fed by 70% paddy husk, 15% Gliricidia sepium fuel wood, 15% sawdust and 0-1% coconut shells. Total output was expected to be 7.2GWh annually. Tokyo Cement Company was a joint-venture between St. Anthony's Consolidated and Mitsui Mining, incorporated in 1982. In March 2008 the project signed a PPA with Ceylon Electricity Board. In June 2008 it received approval of the Sri Lanka Sustainable Energy Authority. In September 2008 the project was commissioned. The steam turbine generator was purchased in September 2005. The operational life of the plant is 25 years. The project was to consist of a water tube boiler by Thermal Systems (India) and a turbo generator from Toyodenki (Japan). Total project cost was Rs. 650 million (US$5.05 million). Financial closure date was ESTIMATED at September 2008 (commissioning). http://cdm.unfccc.int/filestorage/6/J/B/6JB9TVRXPE5N10CL3YWHKFDUG2OA8I/2772-PDD%20Clean.pdf?t=eUN8bWV4aWV1fDDr13Z7vYZRTVwkGXC218ZO Total cost seem low, but this is reported in CDM documentation. More info needed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
