logo

Tokyo Cement Biomass Plant

One of 30 projects Taiyo tracks in Trincomalee.

Source: World Bank Group

Project
Active

Tokyo Cement Company developed the 10MW Biomass plant at Trincomalee City, Trincomalee District, Eastern Province. The project was to be fed by 70% paddy husk, 15% Gliricidia sepium fuel wood, 15% sawdust and 0-1% coconut shells. Total output was expected to be 7.2GWh annually. Tokyo Cement Company was a joint-venture between St. Anthony's Consolidated and Mitsui Mining, incorporated in 1982.

I

Status
Prospective
Sector
Biomass, Geothermal, Wind, Power Generation (CCGT), Water Supply and Storage, Commercial, Manufacturing (Industrial), Government
Location
Trincomalee, Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tokyo Cement Biomass Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tokyo Cement Biomass Plant” is an infrastructure initiative in the Biomass sector, located in Trincomalee, Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tokyo Cement Company developed the 10MW Biomass plant at Trincomalee City, Trincomalee District, Eastern Province. The project was to be fed by 70% paddy husk, 15% Gliricidia sepium fuel wood, 15% sawdust and 0-1% coconut shells. Total output was expected to be 7.2GWh annually. Tokyo Cement Company was a joint-venture between St. Anthony's Consolidated and Mitsui Mining, incorporated in 1982. In March 2008 the project signed a PPA with Ceylon Electricity Board. In June 2008 it received approval of the Sri Lanka Sustainable Energy Authority. In September 2008 the project was commissioned. The steam turbine generator was purchased in September 2005. The operational life of the plant is 25 years. The project was to consist of a water tube boiler by Thermal Systems (India) and a turbo generator from Toyodenki (Japan). Total project cost was Rs. 650 million (US$5.05 million). Financial closure date was ESTIMATED at September 2008 (commissioning). http://cdm.unfccc.int/filestorage/6/J/B/6JB9TVRXPE5N10CL3YWHKFDUG2OA8I/2772-PDD%20Clean.pdf?t=eUN8bWV4aWV1fDDr13Z7vYZRTVwkGXC218ZO Total cost seem low, but this is reported in CDM documentation. More info needed.

Original sector

Energy

Budget

Location

Country

Sri Lanka

State

Trincomalee

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Geothermal, Wind, Power Generation (CCGT), Water Supply and Storage, Commercial, Manufacturing (Industrial), Government

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project