Tolaram Lagos FZ Equity
Sector: Warehouse • Location: Nigeria
Source: International Finance Corporation (IFC)
Tolaram (“Tolaram”, or the “Client”) owns and operates the Lagos Free Zone Company (“LFZC”, the “Project” or the “Company”), a subsidiary of Tolaram, managing the Lagos Free Zone (“LFZ” or ‘the Zone”) located in Ibeju-Lekki of Lagos State, approximately 60 kilometers east of the city of Lagos in Nigeria. The total area of the LFZ is 842ha divided into 2 parcels. The main LFZ site of 624 hectare
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Tolaram (“Tolaram”, or the “Client”) owns and operates the Lagos Free Zone Company (“LFZC”, the “Project” or the “Company”), a subsidiary of Tolaram, managing the Lagos Free Zone (“LFZ” or ‘the Zone”) located in Ibeju-Lekki of Lagos State, approximately 60 kilometers east of the city of Lagos in Nigeria. The total area of the LFZ is 842ha divided into 2 parcels. The main LFZ site of 624 hectares (Parcel A) is north of the Lekki coastal road and the other parcel of 116 hectares (Parcel B) is a waterfront site located south of the coastal road. Development of the LFZ is being undertaken in three phases, with Phase 1 covering a 300ha of Parcel A and Phases 2 and 3 covering the remaining area. A total of 70% of the LFZ is marked for development and operation of industrial facilities, 20% is for logistics and 10% for real estate development to support activities such as trading, manufacturing, packaging, warehousing and other ancillary services as per the Lagos Free Trade Zone Regulations (LFTZ Regulations, 2016) issued pursuant to the Nigerian Export Processing Zones Authority (NEPZA) Act (NEPZA Act). Phase 1: Completion of the LFZ Phase 1 Development Plan is planned for 2024 with approximately 80% of Phase 1 completed. This includes: (i) a deep sea port (Lekki Port or ‘LP’); (ii) an industrial hub with standard industrial manufacturing factories and warehouses; (iii) 2 residential towers; (iv) ancillary facilities, including a power plant, a solid waste management or materials recovery facility; (v) road infrastructure within the LFZ; and (vi) zone level support infrastructure including a customs processing center, police station, a security command center, a helipad, a fire station, a truck park, a medical clinic, a broadband network and bank branches. Facilities to be completed as part of the Phase 1 include: (i) a Piped Natural Gas (PNG) power plant; (ii) an additional residential tower; (iii) an industrial training center, and; (iv) an EDGE certified commercial office tower. Phase 2: Phase 2 of the LFZ is expected to be developed in 2-3 years after the completion of Phase 1. Facilities to be developed include: (i) additional industrial facilities; (ii) a heavy vehicles truck park; (iii) additional residential apartments (iv) water supply network. Phase 3: the waterfront site is earmarked for non-industrial use such as residential, commercial, utilities and future mixed-use development. It will also be the recreational and tourism area in LFZ due to its location outside the bonded zone. A desalination and effluent treatment plant is also planned once the zone is fully developed. IFC is considering a financing package made up of (i) an equity commitment of up to US$ 50 million and (ii) a corporate finance loan of up to US$100 million for the Lagos Free Zone Company (LFZC). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
