logo

Toledo Coal Power Plant

Sector: Power Generation (CCGT) • Location: Philippines

Source: World Bank Group

Project
Active

In July 1994, Toledo Power Co. purchased for US$53 million a 32.5% stake in two power plants on the island of Cebu from the state-owned Atlas Mining & Development Corp. The plants were the 93 MW coal and oil-fueled Sangi station at Toledo and the 42 MW oil-fired Carmen station on Atlas Mining property in Barangay Sigpit. The plants were to be operated by CMS Generation Co. (a subsidiary of CMS E

Project Information FAQ

Project Information

4 Q
The project “Toledo Coal Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In July 1994, Toledo Power Co. purchased for US$53 million a 32.5% stake in two power plants on the island of Cebu from the state-owned Atlas Mining & Development Corp. The plants were the 93 MW coal and oil-fueled Sangi station at Toledo and the 42 MW oil-fired Carmen station on Atlas Mining property in Barangay Sigpit. The plants were to be operated by CMS Generation Co. (a subsidiary of CMS Energy, USA), which also assumed the risks of plant cost, financing, in-service debt, plant availability and long-term fuel supply. Power from the plants were to be sold to Napocor (the Philippine National Generation Company) and CEBECO, the local electric cooperative serving the Toledo City area, under existing power purchase agreements which were transferred to Toledo Power. These purchase agreements were due to expire in 2004. Toledo Power was initially owned by CMS Generation Co., A Soriano Corporation (30%, ANSCOR, Phillipines, the owner of Atlas Mining), J.G. Summit Holdings Inc (Philippines) and Chemphil Import & Export Corporation (Philippines). In July 2003, Mirant Corporation (United States) and Metrobank Group (Philippines) established a 50:50 joint venture - Mirant Global Philippines Corp. - that purchased Toledo Power Co. In October 2004, Mirant Global announced that it intended to expand the plant by 100 MW at a cost of US$100 million. As of Dec. 31, 2008, the proposed expansion was being implemented a separate project via Cebu Energy Development Corp. consortium. In May 2006, Mirant Corporation sold its holding in Mirant Global Philippines Corp. to Global Business Power Corporation, a Metrobank subsidiary. As a consequence, Metrobank Group became the 100% owner of Toledo Power Co.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data