TOLL ROAD CONCESSION
Sector: Road • Location: Colombia
Source: World Bank Group
The Toll Road Concession Project aims to improve transport conditions along a strategic road corridor linking Bogota with Medellin and the ports on the north coast through an effective and sustainable private-public partnership. There are 3 components. The first comprises the project works to be undertaken during the construction phase of the concession. They entail re-building, operating, and mai
- Status
- Closed
- Sector
- Road, Waste Processing and Treatment, Seaport, Cement, Commercial, Government
- Location
- Colombia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TOLL ROAD CONCESSION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Toll Road Concession Project aims to improve transport conditions along a strategic road corridor linking Bogota with Medellin and the ports on the north coast through an effective and sustainable private-public partnership. There are 3 components. The first comprises the project works to be undertaken during the construction phase of the concession. They entail re-building, operating, and maintaining existing roads; constructing a new highway; and establishing and managing a natural reserve of sub-Andean forest to offset the project's environmental impact. Road improvements include an asphalt concrete overlay and improvements to sections in critical condition due to recurring landslides and drainage deficiencies; tunnels, bridges, and viaducts; and repaving works needed to maintain the level of service along the road network assigned to the concessionaire and to build the infrastructure needed to collect tolls and operate the natural reserve along the Rio Negro. The second component comprises 1) all the studies and services needed to develop and manage the project, finalize the engineering designs, and assure quality control of construction and operation activities during the pre-construction and construction phases; and 2) external supervision services to be hired to oversee the execution of the concession contract. The third component comprises project expenditures related to construction that are needed to mobilize private financing. |
Original sector | Transportation |
Budget |
Location
Country | Colombia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Seaport, Cement, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
