Tolt 2 Watermain Replacement
Sector: Water Supply and Storage • Location: Duvall, Washington, United States of America
Source: Dodge USA
Description of Proposal: This project is to install approximately 2,800 linear feet of new 12-inch High-Density Polyethylene (HDPE) water main, which will replace an existing 10-inch Asbestos Concrete line that will be abandoned in place. Most of the work will employ traditional cut and cover techniques for water main installation. Current plans include Horizontal Directional Drilling (HDD) approx
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Cement, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Duvall, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tolt 2 Watermain Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description of Proposal: This project is to install approximately 2,800 linear feet of new 12-inch High-Density Polyethylene (HDPE) water main, which will replace an existing 10-inch Asbestos Concrete line that will be abandoned in place. Most of the work will employ traditional cut and cover techniques for water main installation. Current plans include Horizontal Directional Drilling (HDD) approximately 800 linear feet of the water main as it crosses underneath Stream A and its respective bu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Duvall |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Cement, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
