Toltec 9 - Town Homes
Sector: Water Supply and Storage • Location: Los Angeles, California, United States of America
Source: Dodge USA
Demolition and clearing of 2,000 SF foundation and 110 feet of 6' retaining wall. Demo and removal of four underground septic tanks. Grading Caissons & Shoring Retaining Walls Foundations and Grade Beams Perimeter Block Walls Waterproofing (underground and decks) On-Site Drainage and LID System On and Off-Site Dry Utilities On-Site Underground Water System On-Site and Off-Site Sewer (incl. sewage
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Residential, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Toltec 9 - Town Homes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition and clearing of 2,000 SF foundation and 110 feet of 6' retaining wall. Demo and removal of four underground septic tanks. Grading Caissons & Shoring Retaining Walls Foundations and Grade Beams Perimeter Block Walls Waterproofing (underground and decks) On-Site Drainage and LID System On and Off-Site Dry Utilities On-Site Underground Water System On-Site and Off-Site Sewer (incl. sewage ejector pump/pit) Sidewalk, Curb, Gutter and Paving Off-Site Storm Drain Street Lights (two) Driv... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Residential, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
